Additional Info

  • Location:  Madrid
  • Work done:  Total refurbishment
  • Area:  84,73 m2
  • Date:  2014

Oviedo 20 | Madrid
Oviedo 20 | Madrid

Related

Ferraz 22 | Madrid Ferraz 22 | Madrid
Flat reform
Pelayo 3 | Madrid Pelayo 3 | Madrid
Flat reform